Children's clothing manufacturer in Bangladesh
The only category where a design detail can be illegal rather than just unpopular.
Overview
Bodysuits, tees, sets and outerwear for baby, toddler and youth. Kidswear runs on the same knit and woven constructions as the rest of our range, but it is governed by safety regulation that has no equivalent in adult apparel, and that regulation shapes the design rather than merely checking it afterwards. Drawcords at the neck and hood are restricted in children's upper-body garments under EN 14682 in Europe, because of a documented strangulation risk — a hood drawcord that is unremarkable on an adult hoodie cannot ship on a child's. Small parts that detach become choking hazards, so buttons, poppers and appliqué are pull-tested rather than assumed. In the US, CPSIA sets limits on lead and phthalates in anything a child handles, and testing is mandatory rather than optional. None of this is a reason to avoid the category; it is a reason to design with it in view from the first sketch.
What's actually in the spec.
There's no honest single number to publish here.
Kidswear pricing varies too much by leather grade, hardware and volume for a general range to mean anything. Here's what actually makes up the FOB price, so you can read a quote line by line instead of taking a number on faith.
| Cost component | Share of FOB | What it covers |
|---|---|---|
| Fabric | 50–65% | Yarn, knitting or weaving, dyeing, finishing |
| Trims & accessories | 5–12% | Labels, zips, buttons, thread, elastic, packaging |
| CM (cut & make) | 15–25% | Cutting, sewing, finishing, factory overhead |
| Wash / print / embroidery | 0–15% | Optional decoration — adds up fast |
| Factory margin & compliance | 8–12% | Audits, certifications, testing |
500 pieces per style/colour
100 pieces via Collective Studio (GOTS organic)
12–18 weeks from approved tech pack, including safety testing
What buyers ask about kidswear.
Ready to cost your kidswear programme?
Send a reference and a target quantity — we'll come back with construction options, costing and lead-time the same day.