Skip to content
Belle Vouz
Products
ApparelBottomsJoggers · Leggings · Shorts

Jogger, legging and shorts manufacturer in Bangladesh

Waistband, gusset and hem — where a jogger or legging is actually won or lost.

Bottoms — Joggers · Leggings · Shorts, produced by the Belle Vouz group

Overview

Joggers, sweatpants, leggings and shorts built on French terry, fleece and performance jersey. This is a category where the visible fabric matters less than three details buyers routinely leave off a tech pack: the waistband construction, the gusset, and the hem. A jogger's waistband is either a folded self-fabric casing with a drawcord threaded through, or a separate ribbed band joined with elastic — the second costs more and holds its shape far longer. Leggings live or die on the gusset: a diamond or triangular panel at the crotch removes the four-seam intersection that otherwise sits under load every time the wearer squats, and it is the single most common reason cheap leggings split. Flatlock seams throughout keep the garment from chafing under movement, and they cost more machine minutes than an overlock.

BSCIWRAPOEKO-TEXGOTS
Specifications

What's actually in the spec.

ConstructionsFrench terry, brushed fleece, performance jersey, ponte
Fibre optionsCotton, cotton-poly, recycled poly-elastane, organic cotton
DetailRibbed or casing waistband, gusset, flatlock seams, side pockets
DecorationScreen print, embroidery, heat transfer, woven side labels
What drives the price

There's no honest single number to publish here.

Bottoms pricing varies too much by leather grade, hardware and volume for a general range to mean anything. Here's what actually makes up the FOB price, so you can read a quote line by line instead of taking a number on faith.

Cost componentShare of FOBWhat it covers
Fabric50–65%Yarn, knitting or weaving, dyeing, finishing
Trims & accessories5–12%Labels, zips, buttons, thread, elastic, packaging
CM (cut & make)15–25%Cutting, sewing, finishing, factory overhead
Wash / print / embroidery0–15%Optional decoration — adds up fast
Factory margin & compliance8–12%Audits, certifications, testing
MOQ

500 pieces per style/colour

100 pieces via Collective Studio (GOTS organic)

Lead time

10–16 weeks from approved tech pack to ex-factory

Questions

What buyers ask about bottoms.

Let's talk

Ready to cost your bottoms programme?

Send a reference and a target quantity — we'll come back with construction options, costing and lead-time the same day.

Request a Quote